Projets en

PROJECTS


Since our creation, we have supported a large number of projects, with different leaders. Find here the most emblematic of them and their support phases realized.

El@out

Rethink a low-tech prototype to make it functional and usable, then set up the production chain with Gorilla, the service provider retained in Gabon. Project leader: CIRAD (Center for International Cooperation in Agronomic Research for Development) & CVT Valorisation Sud. Date: June 2015 to now.

Conception 40%
Prototyping 20%
Fabrication 40%

Chandelier Krishna

Based on provided sketched form and a story, the team made parts drawing, their 3D modelling and works on the mechanical joining. She also managed part of the manufacturing process with the search for service providers and materials, then the logistics between various manufacturing stages with the customer. Project leader: Lustrerie Mathieu (Gargas) Date: summer 2018

Conception 60%
Prototyping 10%
Fabrication 30%

Multidimensional accelerator (vestibular carousel)

Conceptual design, mechanical design then production of a 1/10 scale model. Finally, establishment of partnership with future service providers, as a coordinator. This project is awaiting funding for the manufacture of a full scale prototype. Project leader: CNRS Sensory and Cognitive Neuroscience Laboratory (Aix-Marseille) Date: from 2017 to today.

Conception 70%
Prototyping 30%
Fabrication 0%

Janus Poirier

The artists’ faces 3D scan, modelling and 3D printing to validate the file, which was then used by a art caster to produce a monumental statue. Project leader: Anne & Patrick Poirier (contemporary art artists) Date: Support and realisation on their various projects since 2015.

Conception 80%
Prototyping 20%
Fabrication 0%

Autonomous surveillance quad

Adaptation, modelling and machining of a casting mould by milling and search for service providers for the manufacture of the fairing of the autonomous surveillance quad. Project leaderTBC France Date: december 2017

Conception 50%
Prototyping 50%
Fabrication 0%

Computing cluster Framboisine

Assembly and integration of the different elements of a nomadic computing cluster in a fly-case, for researchers in tropical areas. Project leader: Laboratoire IRD de Montpellier Date: From 2016 to 2019.

Conception 10%
Prototyping 0%
Fabrication 90%

Ichtyosaur

Realisation of the casting mould of the Ichthyosaur fossil from a 3D scan of the fossil preserved copy. Then machining of a mould for moulding to preserve and exhibit the fossil. Piece currently visible on the Robine-sur-Galabre site. Project leader: Commune de Digne les Bains et Musée de Géologie. Date: from april to septembre 2018

Conception 10%
Prototyping 90%
Fabrication 0%

Topographic model

Realisation of a topographic model:  : recovery of IGN topographic data of the lake easement, laser cutting by contour lines and assembly of a topographic plate of 2.5m x 1.5m with division of municipalities. Then realisation of invidual boxes to transport the model. Currently visible at La Maison du Lac, in Saint Cassien. Project leader: Maison du Lac de Saint Cassien (Town of Fayence) Date: from April to Septembre 2018

Conception 40%
Prototyping 0%
Fabrication 60%

Geological cross-section

Geological and topographical cross-section of the Vaucluse mountains from the Durance to the Mont Ventoux. Currently visible at the Museum. Project leader: Apt Geological Museum, in partnership with the Parc Naturel Régional du Luberon. Date: 2016

Conception 50%
Prototyping 50%
Fabrication 0%

Rhombic dodecahedron

Design and production of a monumental rhombic dodecahedron for the Summer University of Regional Natural Parks of France. Unique piece, 1.3m in diameter, with the logos of the 51 parks engraved and cut out. Currently visible at the national headquarters of Regional Natural Parks, in Paris. Project leader: National Association of Regional Natural Parks of France Date: 2016

Conception 50%
Prototyping 50%
Fabrication 0%

Pipette

Reconstitution and creation of an object dating from the Roman period, from the remains of excavations and illustrations which subsequently allowed, after tests, to validate a theory of the object use. Project leader: Musée de l’Arles Antique Date: 2016

Conception 20%
Prototyping 80%
Fabrication 0%